Today was the day of cement. We got the mast base poured and almost all of the anchor holes. First on Sunday we had to get all the cages and anchors set in the holes and lined up at the right angles. Then the holes had to be inspected before we could pour.
The portable generator to power the welder
David telling me something
Gordon helping get the anchor head lined up and Sammy working hard in the background
It took 9 trucks to fill the container and around the sides for the mast base - about 77 yards I think
The South Africans working on taking down the slew switch
More progress on the new tower sections
The container all filled up with flowable fill. A cage and 3000 psi concrete will go on top
Pouring anchor holes
Same hole as above
One way to even out the cement - with the excavator
Another way to even out the cement - using the vibration from the roller
David checking the angle
At the end of the day 25 truckloads of cement were poured for a total of 221 yards and over 750,000 pounds. Praise the Lord!